S.N. |
Materials |
Brand |
|
1 |
OPC Cement |
Hongshi |
|
2 |
PPC Cement |
United |
|
3 |
Rebar (Dandi)/Binding Wire |
Ambe |
|
4 |
Sand |
Double Wash River |
|
5 |
Aggregate (40 mm) |
Crusher |
|
6 |
Aggregate (20 mm down) |
Crusher |
|
7 |
Bricks |
Everest |
|
8 |
Bricks for Soling (Tukra) |
Bhaktapur No.1 |
|
9 |
Tiles |
Prime |
|
10 |
Granite |
Pashupati |
|
11 |
White Putty |
Asian |
|
12 |
Paint |
Asian |
|
13 |
Weather Coat |
Asian |
|
14 |
Ashtar |
Asian |
|
15 |
Capra |
Asian |
|
16 |
Spirit |
As per market availability |
|
17 |
White Cement |
Asian |
|
18 |
UPVC |
Dubal |
|
19 |
Saal Wood |
Nepal Saal |
|
20 |
Grill & Railing Works |
As per market availability |
|
21 |
Sanitary |
Bencado |
|
22 |
Electrical Brand |
Rathi |
|
27 |
Cabinet Kitchen with Chimney |
As per design specification |
Chandragiri
Plot Area
121.4 square meters
Design Style
Modern Box design
Project Status
Under Construction
Start Date
October 2025
Expected Completion
August 2026
Technical Team
Archana Basnet
Architect
Om prakash Neupane
Chief Engineer
Om Prakash
Project Manager
Built-Up Area
Area Details
| Description | Area (sq. ft.) |
|---|---|
| Foundation | 900.20 |
| Ground Floor | 900.20 |
| First Floor | 954.56 |
| Second Floor | 270.00 |
| Total Built-Up Area | 3026.96 |
Work Scope
- Design & BOQ Estimation
- Structural Drawing & 3D Visualization
- Construction up to Finishing
- Interior Design & Landscaping
Water System
- Septic tank: 7,000 liters
- Reserve tank: 10,000 liters
- Overhead tanks: 2 × 1,000 liters